
SRTA hired a consultant to assist with the development of public outreach materials and conceptual drawings for many of the ATP Cycle 5 projects. The report on those projects is accessible via the links provided below.
Appendix A: Cottonwood Lasso Loop Plans and Cost Estimate
Appendix B: West Cottonwood School Connector Plans and Cost Estimate
Appendix C: CATTLE Network Plans and Cost Estimate
